Plan
Step 1Define the business outcome and measurable success criteria.
Required deliverable
Scope brief with one target metric and one failure threshold
This lifecycle keeps agentic projects fast without sacrificing governance. Every stage has a specific output and an explicit handoff.
Think of this as a loop, not a straight line. Every deployment creates feedback that should restart planning with better context.
01
Plan
02
Architect
03
Prompt
04
Build
05
Review
06
Deploy
07
Iterate
After Iterate, feed learnings back into Plan.
Define the business outcome and measurable success criteria.
Required deliverable
Scope brief with one target metric and one failure threshold
Map agents, tools, permissions, and data boundaries.
Required deliverable
System diagram with ownership and guardrail contracts
Design reusable prompt specs per role and edge-case behavior.
Required deliverable
Versioned prompt pack with evaluation fixtures
Implement workflows, memory adapters, and runtime controls.
Required deliverable
Working pipeline with instrumentation hooks
Run QA, policy checks, and human sign-off checkpoints.
Required deliverable
Approval log plus rollback playbook
Release safely with monitoring and alert thresholds enabled.
Required deliverable
Production release with SLO and incident triggers
Improve prompts, flows, and economics from live feedback.
Required deliverable
Weekly optimization backlog tied to business impact
Use this lifecycle together with the framework comparison and tooling ecosystem guide to turn strategy into a shippable roadmap.
CTA
We can convert your current workflow into a stage-based operating system with measurable checkpoints and delivery velocity targets.