Connect with me via the floating button
A practical checklist for shipping an AI product in 2-3 weeks. Plan fast, build the MVP, test with confidence, and launch with a clear feedback loop.
Sprint length
2-3 weeks
Checklist items
25 steps
Phases covered
Planning → Launch
A quick look at what you'll get inside the sprint checklist.
Use this checklist as your sprint command center. It keeps teams aligned, surfaces risks early, and makes sure every AI launch has real feedback built in.
25-step checklist organized by phase so nothing slips.
Practical guardrails for cost, latency, and safety.
A repeatable workflow for 2-3 week AI sprints.